28 October 2026 · 4 min read · Fieldor teamMost ATM downtime isn't spent fixing the machine. It goes on everything around the fix: noticing the fault, raising a ticket, finding someone who can attend, getting them there with the right part, and confirming the ATM really works again. Shorten those gaps and uptime improves without anyone working harder on site.
This playbook is for operations heads at banks, ATM OEMs and managed-service providers who run hundreds or thousands of machines. It follows a single fault from start to finish and looks at where the time goes.
The slowest way to find out an ATM is down is a customer complaint or a branch phone call. By then the machine may have been out for hours.
A second visit can easily double the downtime of a fault. Two of the commonest causes are an engineer who isn't trained on that model, or one who arrives without the part.
"Reached site" in a spreadsheet is a claim, not a fact. Without proof of arrival, SLA reports turn into arguments between the bank, the OEM and the field partner.
A ticket closed on the engineer's word is the start of the next dispute. Ask for evidence that is hard to fake and quick to give:
When proof is part of closing the ticket, it costs the engineer a minute and saves the coordinator an afternoon.
Many long outages are really spares problems: the part exists, just not where it's needed. Track spares from depot to van to machine, and track failed parts back. Patterns show up quickly: a site that eats card readers, a model whose pick modules fail early, a depot that is always short.
Internal reports often stop the clock at "engineer assigned" or "engineer arrived". The bank's clock stops when customers can use the machine again. Measure from first fault signal to verified working machine, and break that into its parts: detection, assignment, travel, repair and verification. The biggest part is where to act first.
Downtime you can't break into parts is downtime you can only argue about.
Fieldor was built to run exactly this loop. Tickets are raised from switch and monitoring feeds, the engineer is chosen with training and spares in mind, arrival is confirmed by geofence, and tickets close with stamped photos and a test withdrawal. Every step lands on one shared record, so the uptime report is a by-product of the work rather than a monthly argument. The same approach runs maintenance for bank branches, guarded sites and other distributed estates.